The repair had the following specifications:
Structure | Drencher System (1" and 2") |
Class Approval | DNV |
Design Pressure | 16 bar |
Design Temperature | 90 °C |
Design Code | ASME B31.1 |
Schedule / Wall Thickness (WT) | 2.5mm |
Flange materials/specification | EEMUA 145 (CuNi) |
Geometory | Various built up on deck |
Defect Details | External damage to multiple locations |
A drencher system had suffered significant impact damage in multiple locations on a floating production system (FPSO). A combination of spools were cut and installed on the offshore facility using Quickflange.
The installation was completed over a 5 day period without impacting on hydrocarbon production as there was no requirement for hot work.
Leave your contact details along with any relevent project descriptions and photos, and we will get back to you with a solution.