The repair had the following specifications:
Design Pressure | 600kPa |
Diameter (NB) | 250mm |
Surface Preparation | ST3 |
Material of Line | GRE (Glass Reinforced Epoxy) |
Design Temperature | 80 °C |
Design Life | 4 years |
Defect Type | Hole |
Defect Size | 5m Through Wall |
Geometry | Valve and I-Beam |
Crew Size | 2 |
Consolidation Method | Stricture |
An offshore gas processing facility in Western Australia experienced localised internal erosion, resulting in a through-wall defect on the flanged interface of a GRE Seawater Header Line.
A live leak seal was installed with a flow diversion plate to ensure there was no loss of production through shutting down whist the engineered composite repair was applied.
Leave your contact details along with any relevent project descriptions and photos, and we will get back to you with a solution.